@ini_set( 'upload_max_size' , '256M' ); @ini_set( 'post_max_size', '256M'); @ini_set( 'max_execution_time', '300' );
Case Study: Rutland Hall, Event Venue

Case Study: Rutland Hall, Event Venue

Case Study: Rutland Hall, Event Venue Rutland Hall, Event Venue Use: Event Venue Building Type: Aluminium Framed Building Size: 1050 sqm of 30m span x 3.6m eaves Roof Cladding: PVC Thermo Air Filled Fabric Membrane Wall Cladding: 40mm PIR Fitted in: 3 Weeks Install...
Case Study: Film Studio

Case Study: Film Studio

Case Study: Film Studio Film Studio, Production Storage Use: Storing Production Supplies to be used on set. Building Type: Cold Rolled Steel Framed Building Size: 1600 sq m / 17,200 sq ft of 20m span x 6.2m eaves Roof Cladding: 40mm PIR Wall Cladding: Single Skin...
Case Study: Top Hat

Case Study: Top Hat

Case Study: Top Hat Top Hat Use: Goods Inwards Building Type: Cold Rolled Steel Frame Building Size: 1,000 sq m of 20m span x 6m eaves Roof Cladding: Single Skin Steel with Anti-condensation liner. Wall Cladding: Single Skin Steel Fitted in: 4 Week Install Period...
Case Study: Film Studio

Case Study: Film Studio

Case Study: Film Studio Film Studios, Electrical Storage Use: Film Production Electrical Storage Building Type: Aluminium Framed Building Size: 825 sqm/ 8,800 sq ft of 15m span x 6.2m eaves Roof Cladding: PVC Thermo Air Filled Fabric Membrane Wall Cladding: 40mm PIR...
Case Study: Film Studio

Case Study: Film Studio

Case Study: Film Studio Film Studios, Film Workshops Use: 3 New Film Production Workshops were required for rapid response. Building Type: Aluminium Framed Building Size: 2,000 sqm / 21,500 sqft of 20m span x 6.2m eaves with 500 sqm of Mezzanine Floor Roof Cladding:...